/
Loading deal...
Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread
Brand: Aquapro★★★★★
★★★★★
4.4|200 ratings
Save 17%21.72$26.11
In Stock
FREE delivery Thursday, June 26 on your first order. Order within 13 hrs 38 mins Or fastest delivery Wednesday, June 25
About this item
- For suburban and MorFlo water heaters
- Lead free
- 9 inches long
- 3/4 inch male pipe thread
- Bulk
What customers say
Customers like the fit, functionality, and quality of the hose pipe fitting. They mention it works great and is of good quality.
21.72
FREE delivery Thursday, June 26 on your first order. Order within 13 hrs 38 mins Or fastest delivery Wednesday, June 25
In Stock
Available Options:
1 variationsSecure transaction
Ships from and sold by Amazon.CA
Aqua Pro 69717 Lead Free Magnesium Anode Rod with 3/4 9 1/2 Male Thread
Product Information
Manufacturer | Aqua Pro |
Place of Business | Smyrna, DE 19977, USA |
Brand | Aquapro |
Model | 69717 |
Product Dimensions | 23.37 x 2.29 x 1.78 cm; 167.83 g |
Item model number | 69717 |
Is discontinued by manufacturer | No |
Exterior | Magnesium |
Manufacturer part number | 69717 |
Item Weight | 168 g |
Country of origin | China |
ASIN | B0085IJLR2 |
Best Sellers Rank | #61,820 in Industrial & Scientific (See Top 100 in Industrial & Scientific) #3,476 in Pipe Fittings |
Date First Available | March 28 2014 |